IPO · Power and data centers · Proposed listing on Nasdaq
SB Energy IPO: how the business works
SB Energy runs solar and battery plants, mainly in Texas and California, and is building AI data center campuses leased to SoftBank and OpenAI affiliates. None of the data centers is operating yet.
SB Energy, Inc. · Redwood City, California · Founded 2019
Based on the amended registration statement (Form S-1/A) dated .
The company has publicly filed its registration statement (Form S-1 or F-1) with the SEC. No price range is set yet.
Last updated · Reviewed by Cityfort Research on
- Revenue, FY2025 (29.7% unrealized hedge gains)
- $213.5M
- Net loss to SB Energy, FY2025
- −$738.0M
- Data centers operating (S-1/A, Sep 21, 2026)
- None
- Shares offered and price range
- Not yet in the filing
- Control after the IPO
- SoftBank (controlled company)
01 · The business in one line
What does SB Energy do?
SB Energy sells electricity from its solar and battery plants today, and plans to earn rent from AI data center campuses it is building for companies tied to its owner, SoftBank, and to OpenAI.
- Almost all revenue today comes from selling power under long contracts to utilities, cities and companies, plus gains and losses on power price hedges.
- Every signed data center lease is with a SoftBank or OpenAI affiliate. The company says it expects the first data center rent in the fourth quarter of 2026.
- Building costs far more than it earns: in FY2025 it lost $738.0 million and spent $1,093.0 million on plants and equipment.
02 · The offer
What is the SB Energy IPO?
- New shares sold by the company
- Not yet in the filing
- To list on
- Nasdaq
- Proposed ticker
- SBE
- Lock-up on existing holders
- 180 days
- New shares: SB Energy sells all the shares offered. Underwriters also get a 30-day option to buy extra shares from the company; the number is blank in the S-1/A.
- Only the company sells shares. The S-1/A says OpenAI is not selling and SoftBank takes part only as an existing holder.
- NVIDIA, separately: it agreed to buy $1.5 billion of non-voting Class N shares at the IPO price, closing with the IPO. It also prepaid $1.5 billion on Aug 17, 2026 for Class N shares priced at 90% of the IPO price.
- After the IPO, the parent's shares pass up the ownership chain to the partners of Energy Global, LP (the "Closing Distribution"), and stay locked up for 180 days.
- Listing: the company has applied to list its common stock on Nasdaq and Nasdaq Texas under the symbol SBE.
SB Energy, its directors, executive officers and holders of substantially all its stock agreed not to sell for 180 days after the prospectus date without consent of J.P. Morgan, Goldman Sachs and Morgan Stanley, subject to exceptions. Shares handed on in the Closing Distribution and NVIDIA's Class N shares are also locked up.
Share classes and votes
- Underwriters
- 21 named in the S-1 (lead: J.P. Morgan Securities LLC, Goldman Sachs & Co. LLC, Morgan Stanley & Co. LLC)
- Controlled company
- The S-1/A says SB Energy will be a "controlled company" under Nasdaq and Nasdaq Texas rules because of SoftBank's ownership, and intends to use the exemptions from having a majority-independent board and fully independent compensation and nominating committees.
- Directed share programme
- The S-1/A says the underwriters will reserve up to 5% of the shares offered for directors, officers, certain employees and other individuals associated with the company, sold by J.P. Morgan Securities through a directed share program.
- Lead underwriters
- J.P. Morgan Securities LLC, Goldman Sachs & Co. LLC, Morgan Stanley & Co. LLC
- Transfer agent
- Fidelity Stock Transfer Solutions LLC
03 · Where the new money goes
What will SB Energy do with the money it raises?
- General corporate purposes, with priority to working capital, operating expenses and capital spending to build data center, power, storage and related projects.The company says it expects to use substantially all of the net proceeds this way and, within capital spending, to prioritize its equity share of project-level financings for contracted projects. No amounts are stated.Amount not fixed
- Possibly technology development and buying or investing in complementary businesses.The company says it has no binding agreements for any material acquisition or investment.Amount not fixed
The company says it will not use the proceeds to repay the about $473.0 million Hickory Facilities (a new credit facility refinances them), and does not expect to pay net proceeds directly to SoftBank or OpenAI. It plans to repay $709.5 million of notes owed to its parent SBE Global from cash on hand. NVIDIA's private placement money also goes to general corporate purposes.
Only the shares the company sells raise money for it; money from shares sold by existing stockholders goes to them.
04 · What it sells
What does SB Energy sell?
Electricity from solar and battery plants
About 2.2 GWac of solar and battery capacity was operating at Jun 30, 2026, mainly in Texas (the ERCOT grid) and California (CAISO), plus projects in Nevada. Power and renewable energy certificates are sold under contracts of 10 to 25 years, mostly paid per unit produced.
AI data center campuses
It finds the site, secures power, builds the campus and leases it on triple-net terms (the tenant pays running costs) for about 15 to 20 years. Rent is set as a return on the total project cost, up to a cap. The S-1/A says its work stops at the server rack: tenants bring their own servers and chips.
Design, engineering and construction services
Its Solutions segment designs, engineers and manages construction and operations for the company's own power and data center projects at a mark-up. That work ($62.4 million in FY2025) is removed from consolidated revenue.
Think of it like this
Like a landlord that builds warehouses for computer chips: the tenant brings the servers, and SB Energy supplies the building, the power connection and the cooling.
What it does
- Does: Builds, owns and runs solar farms and battery storage plants in the US
- Does: Sells electricity and renewable energy certificates under long-term contracts
- Does: Uses power price swaps (hedges) to fix the price on part of its output
- Does: Develops, builds and leases AI data center campuses in Texas and Ohio
What it does not do
- Does not: Does not rent out computing power or cloud services; tenants bring their own servers and chips
- Does not: Did not operate any data center at the S-1/A date (Sep 21, 2026)
- Does not: Will not own the about 9.2 GW of gas generation planned for the PORTS-Pike campus in Ohio; a SoftBank affiliate is to build it
- Does not: Has no revenue or long-lived assets outside the US
05 · Who pays it
Who pays SB Energy?
Power buyers under contract
67%
of revenue
Utilities, municipal corporations, power authorities, energy service companies, community choice aggregators and large companies buy electricity and renewable energy certificates. Revenue from these contracts was $143.0 million in FY2025.
Power price swaps (hedges)
33%
of revenue
Contracts that fix the price on part of the output. In FY2025, $7.2 million was settled in cash and $63.3 million was unrealized gains: changes in the swaps' value, not cash received.
Data center tenants (SoftBank and OpenAI affiliates)
Not disclosed
A SoftBank affiliate leases the Cosmos campus; OpenAI affiliates lease the Milam County and PORTS-Pike campuses. No rent was received in FY2025; the company says it expects first rent in the fourth quarter of 2026.
- Power buyers under contract67%
- Power price swaps (hedges)33%
Customer concentration
In FY2025 the largest power customer was 29% of consolidated revenue, and four customers were each 10% or more of consolidated revenue. In the six months to Jun 30, 2026, two customers were 27% and 24% of revenue from customer contracts (a different base). The S-1/A does not name them.
- Largest customer
- 29%
06 · How the money flows · FY2025
How does money flow through SB Energy?
Money in
- Revenue from customer contracts$143M
- Settled power price swaps$7.2M
- Unrealized gains on power price swaps (not cash)$63.3M
- Interest income and other income$26.8M
The company
SB Energy
$240M came in
Money out
- Running the plants (cost of operations)$81.4M
- General and administrative, incl. stock-based pay$680M
- Depreciation, amortization and accretion$94.1M
- Interest$162M
- Share of loss in an affiliate$1.7M
- Tax$9.2M
- Net loss, consolidated (before the share of tax-equity partners)−$788M
- Money in: $213.5 million of revenue, of which $63.3 million was unrealized hedge gains, plus $26.8 million of interest and other income.
- Running the plants cost $81.4 million, and wear-and-tear of assets was $94.1 million.
- General and administrative costs were $679.6 million; stock-based pay, a non-cash cost, was $674.1 million for the year.
- Interest on debt took $162.4 million, leaving a consolidated net loss of $788.1 million. After $50.1 million of losses were allocated to tax-equity partners, the loss to SB Energy was $738.0 million.
07 · What it needs to run
What does SB Energy need to run?
Land and sites
Power projects mostly sit on land leased long-term from landowners; data center sites are bought or leased. One PORTS-Pike building is to sit on land leased from the US Department of Energy in Feb 2026.
Grid connections
Every project needs approval to connect to the grid, and the S-1/A flags queue backlogs and costs. The utility AEP Ohio plans about $5.1 billion of grid upgrades for PORTS-Pike, to be charged back to the campus over its term.
Equipment from few suppliers
Batteries, turbines and transformers come from a small number of suppliers. Purchase commitments to suppliers were $6.3 billion for the rest of 2026 through 2028, as of Jun 30, 2026.
Project money
The company says it has raised about $19 billion of project capital since 2019 (about $15 billion of debt and nearly $4 billion of tax equity) across 37 project financings.
People
223 full-time employees and 89 contractors at Jun 30, 2026; none is in a union.
08 · Why it makes money
Why does SB Energy make money?
It signs long contracts first, borrows against them, builds, then collects for 15 to 25 years.
A solar farm or data center costs a lot up front and earns for decades. SB Energy signs the buyer or tenant before building, funds most of the cost with project debt and tax-equity money, and is paid only once each project is running. Until then, building costs and interest come before income.
Revenue from customer contracts, US$ million
$100.6$143.0
FY2024 to FY2025
- Find land with grid access and apply to connect
- Sign a 10-25 year power contract or a 15-20 year data center lease
- Raise project debt and tax-equity money against that contract
- Build; data center rent starts when each phase is ready for service
- Collect power payments or rent, repay project debt, keep the rest
↺ Step 5 feeds back into step 1.
09 · Business segments · Six months ended Jun 30, 2026
Which businesses make up SB Energy?
Standalone Power
100%Solar and battery plants selling power under contracts, hedges and some market sales. It produced all revenue in FY2024 and FY2025.
Revenue $138M
Data Centers
1%AI data center campuses. Its first revenue, $0.7 million, appeared in the three months to Jun 30, 2026; no campus is operating yet.
Revenue $0.7M
How the mix changed
- Standalone Power
- Data Centers
Revenue by segment, FY2024 to FY2025.
See the numbers
10 · Where it sells · FY2025
Where does SB Energy sell?
11 · Competitors and what protects it
Who does SB Energy compete with?
NextEra Energy
Named by the company as a competitor in utility-scale solar and storage.
AES Corporation
Named as a competitor in utility-scale solar and storage.
Clearway Energy
Named as a competitor in utility-scale solar and storage.
Digital Realty
Named as a US data center provider it competes with.
Equinix
Named as a US data center provider it competes with.
Private data center operators (QTS, Vantage Data Centers, Switch, CyrusOne, Aligned Data Centers)
Named as private competitors in data centers, alongside private-equity-backed platforms.
Large cloud providers (Amazon, Google, IBM, Microsoft, Oracle)
Named as competitors with broader portfolios that also build their own capacity.
What protects the business
Each strength is scored 1 (weak) to 5 (strong) for the business, with the reason. It is not a rating of the share.
- Long contracts4 of 5
Data center leases run about 15 to 20 years with no termination for convenience, and power contracts 10 to 25 years. The company reports weighted average remaining contract lengths of 19.6 years for data centers and 16.6 years for power.
- Experience building power projects3 of 5
The company says it has developed, financed and begun construction on 4.7 GWac of solar and storage since 2019, with 24 customers and 37 project financings. It has no record of running a data center yet.
Weak spot
No operating data center, related tenants only
No data center was operating at Sep 21, 2026, and every signed data center lease is with a SoftBank or OpenAI affiliate; the S-1/A reports no unaffiliated data center tenant.
12 · Where growth could come from
Where could SB Energy's growth come from?
The company says in its S-1/A (Sep 21, 2026) that it expects first data center revenue from the first phase of the Cosmos campus in the fourth quarter of 2026, and targets ready-for-service dates of 2026 to 2028 for the two campuses under construction (Cosmos and the two Milam County buildings).
Cosmos campus, Travis County, Texas (about 50 MW-IT)
EarlyUnder construction since Mar 2026; tenant: SoftBank affiliate
First rent is due on the earlier of Dec 11, 2026 or the ready-for-service date. Expected rent over the 15-year initial term is about $2.5 billion, the company says. Funded by $999.0 million of 8.875% notes due 2031.
Status: Early, too early to judge.
Milam County campus, Texas (753 MW-IT in two buildings)
EarlyUnder construction since Apr 2026; tenant: OpenAI affiliate
Target ready-for-service dates are 2027 to 2028. Construction financing was in active discussions and not closed at the S-1/A date.
Status: Early, too early to judge.
PORTS-Pike campus, Pike County, Ohio (about 8.0 GW-IT in 17 buildings)
NewLeases signed Aug 2026; not yet under construction
The last buildings are targeted for 2031 and 2032. The campus needs about 9.2 GW of gas generation that a SoftBank affiliate is to build, funded under the US-Japan partnership; the company has no agreement with any government entity on that funding.
Status: New, recently announced.
Solar and storage under construction (about 2.5 GWac)
EarlyAbout 0.8 GWac more is contracted but not yet under construction
These projects already have long-term power contracts; together with operating plants they make up the company's 5.5 GWac contracted power portfolio.
Status: Early, too early to judge.
Status compares progress with what the company itself said it would do: Working = on track against what the company said; Mixed = partly on track; Behind = behind the company's own plan; New = recently announced; Early = too early to judge.
13 · The numbers · Consolidated · US$
How has SB Energy done?
Revenue
$214MFY2025
Revenue fell 8.1% to $213.5 million in FY2025, while revenue from customer contracts rose 42.2% to $143.0 million as unrealized hedge gains fell from $119.3 million to $63.3 million.
See the numbers
Net profit
−$738MFY2025
SB Energy's share went from a $106.1 million profit in FY2024, created by an accounting allocation to tax-equity partners, to a $738.0 million loss in FY2025 that included $674.1 million of non-cash stock-based pay. EBITDA in the table is operating loss plus depreciation, amortization and accretion.
See the numbers
Free cash flow
−$1.1BFY2025
Cash from operations was negative in both years, and spending on plants and equipment rose from $601.2 million to $1,093.0 million, so free cash flow was −$1,133.0 million in FY2025.
US$ · cash from operations minus spending on plants and equipment · Source: SB Energy, Inc. Form S-1/A (Amendment No. 2) registration statement with preliminary prospectus, filed Sep 21, 2026 (Registration No. 333-298675)
See the numbers
See all yearly numbers
EBITDA here = operating income plus depreciation and amortization (from the cash flow statement). Fiscal years are the company's own (December 31 (calendar year)). Net profit is the share belonging to the company's owners. Total net income differs from net profit to the company's owners: under the HLBV method (hypothetical liquidation at book value), losses are allocated to tax-equity partners who invested in projects for tax credits: $310.2 million in FY2024, which turned a $204.1 million consolidated loss into a $106.1 million profit for SB Energy, and $50.1 million in FY2025.
What revenue is made of · Six months ended Jun 30, 2026
About half of this period's revenue (48.6%) was unrealized gains on power price swaps: changes in the value of hedging contracts, not cash from customers. Total revenue rose 66.4% from the same six months of 2025, but revenue from customer contracts fell 5.0%. In FY2025, unrealized gains were 29.7% of revenue; in FY2024, 51.4%.
Revenue by type
SB Energy says in its S-1/A that it is an emerging growth company, so the filing gives two audited years instead of three.
Latest part-year · Six months ended Jun 30, 2026 (6 months to Jun 30, 2026)
- Revenue
- $139M
- Net profit
- −$3.2B
A part-year can't be compared with a full year. Audited figures from the S-1/A (interim period unaudited), converted from US$ thousands to US$ million.
14 · The company's own measures · Capacity as of Jun 30, 2026 unless stated; earnings measure FY2025
What do SB Energy's own measures show?
Official (GAAP)
No official figure measures this; it is the company's own operating measure.
Company's own measure: Operating solar and storage capacity
2.2 GWac
Approximate. Solar and battery projects placed in service under grid connection and power sale agreements, as the S-1/A defines it. No data center capacity is operating.
Official (GAAP)
No official figure measures this; it is the company's own operating measure.
Company's own measure: Standalone Power Contracted Portfolio
5.5 GWac
Solar and storage that is operating (about 2.2), under construction (about 2.5) or contracted under long-term power contracts but not yet under construction (about 0.8). Full nameplate counted; solar and storage at the same site are counted separately.
Official (GAAP)
No official figure measures this; it is the company's own operating measure.
Company's own measure: Data Center Contracted Portfolio (at Sep 21, 2026)
8.8 GW-IT
Computer (IT) load under signed leases: about 0.8 GW-IT under construction (Cosmos and Milam) and 8.0 GW-IT contracted but not under construction (PORTS-Pike). None operating. The figure was 0.8 GW-IT at Jun 30, 2026, before the PORTS-Pike leases.
Official (GAAP): Revenue, FY2025
$214M
Company's own measure: Backlog (company estimate, at Sep 21, 2026)
$439.0B
The company estimates about $439 billion of revenue left over the life of signed contracts, excluding pass-through costs, market sales and renewals. It assumes projects are built on time; about $357 billion falls more than 96 months (8 years) out, and about $430 billion is data centers, none yet operating. The financial statements report no remaining performance obligations required to be disclosed (Jun 30, 2026).
Official (GAAP): Net loss, consolidated, FY2025
−$788M
Company's own measure: Total Segment Adjusted EBITDA, FY2025
$120M
Segment profit before interest, tax and depreciation that leaves out stock-based pay ($674.1 million), unrealized hedge gains, unallocated overhead and pre-operating costs. It was $68.6 million in FY2024 and $62.4 million in the six months to Jun 30, 2026.
These are the company's own measures, defined by the company. They are not comparable across companies, and they are not added together. Each sits beside the nearest official (GAAP) figure.
15 · Financial strength · Jun 30, 2026
How much debt does SB Energy have?
- Total debt$4.7B
- Cash and investments$2.2B
- Net debt (debt minus cash)$2.5B
- Net worth (shareholders' money)$1.6B
- Debt to equity
- 3.02×
- $ of debt for every $1 of shareholders' money
- Debt is principal: $4,025.6 million owed to lenders plus $709.5 million of notes owed to the parent SBE Global, which the company says it will repay at the IPO from cash on hand.
- Cash includes $1,016.4 million of restricted cash, as in the company's own Net Debt measure ($1,810.0 million), which leaves out the parent notes, letters of credit and guarantees.
- Only $473.0 million (11.7% of principal) is corporate debt with recourse to the company; the rest is project debt where lenders' claims are limited to the projects.
- Debt due soon: Athos Storage $361.9 million by Feb 26, 2027 and Pelicans Jaw $857.8 million by Mar 31, 2027.
- Liabilities include $5,486.1 million for the OpenAI warrants, a non-cash item re-measured each quarter.
- Equity shown is the member's equity belonging to SB Energy; tax-equity and other minority partners held another $541.5 million. Letters of credit in use were $1,141.6 million.
16 · Who owns it before the IPO · Jul 10, 2026
Who owns SB Energy before the IPO?
Largest stockholders before the IPO
From the prospectus table of principal stockholders. Holdings fall after the IPO when new shares are sold; the prospectus also shows the holding after the offering.
17 · Who runs it
Who runs SB Energy, and did they deliver?
Rich Hossfeld
Co-CEO and director
Co-CEO since the company's inception, the S-1/A says; earlier at True North Venture Partners and First Solar.
Abhijeet Sathe
Co-CEO and director
Co-CEO since inception; earlier chief operating officer of SoftBank's renewable energy business in India.
Gaetan Frotte
Chief Financial Officer
CFO since inception; earlier Senior Vice President and Treasurer at NRG Energy (2006-2023).
Ryan Bates
General Counsel
Earlier at Clearway Energy and NRG Energy.
Alex Clavel
Chair nominee (designated by SoftBank)
CEO of SoftBank Investment Advisers, which manages SoftBank's Vision Funds.
Sachin Katti
Director nominee (designated by OpenAI)
Vice President, Compute Strategy and GPT Infrastructure at OpenAI.
18 · Governance signals
What do SB Energy's governance filings show?
- Auditor
- Deloitte & Touche LLP, since 2021
- Auditor changes
- None in the period covered
- Audit qualifications
- None reported
- Related-party dealings
- SoftBank controls SB Energy and licenses it the "SB Energy" name; a SoftBank affiliate and OpenAI affiliates are its only data center tenants; OpenAI holds warrants and NVIDIA guarantees part of the PORTS-Pike campus value. The S-1/A says the company believes the leases and guarantees were negotiated on terms like those between unrelated parties.
- Credit rating
- No public credit rating found
Flags to know about
other
Material weakness in internal controls
The S-1/A reports a material weakness for the FY2024 and FY2025 statements: review controls over complex accounting were not operating effectively. It was not fixed at Jun 30, 2026.
related party
Related-party tenants
All signed data center leases are with SoftBank and OpenAI affiliates. The company says substantially all near-term data center revenue is expected to come from these leases.
regulatory
National security agreement
Because of its foreign ownership, the company is party to a national security agreement with US authorities (CFIUS) from Dec 2019, covering vendor limits, cybersecurity and notice of project sales.
other
Cyber incidents disclosed
A 2022 phishing attack redirected vendor payments, and in Mar 2026 a contractor's credentials were compromised and malware reached project networks. The company says neither was material.
19 · Group and related parties
How much does SB Energy rely on related parties?
- Control: SoftBank Group controls SB Energy through a chain of entities and has contributed about $3.2 billion of capital to the business, the S-1/A says.
- Name: SoftBank licenses the "SB Energy" name for a royalty of 1% of gross profit; the licence ends automatically if SoftBank stops controlling the company.
- Cosmos tenant: a SoftBank affiliate leases the about 50 MW-IT Cosmos campus for 15 years, with expected rent of about $2.5 billion, guaranteed by SoftBank Group Capital.
- OpenAI tenant: OpenAI affiliates lease the Milam County buildings (753 MW-IT, Jan 2026) and the 17 PORTS-Pike buildings (about 8.0 GW-IT, Aug 2026).
- OpenAI warrants: with the Milam leases, SB Energy gave OpenAI warrants to buy its shares for $0.01 each. Their starting value, $3,646.2 million, is booked as an asset that will reduce lease revenue over the OpenAI lease terms once the leases start.
- OpenAI agreement: OpenAI is the exclusive provider of AI products and services to SB Energy (with exceptions), owns IP in jointly developed projects, and SB Energy has agreed to minimum purchases of $10.0 million (2026), $15.0 million (2027) and $25.0 million (2028) of OpenAI software.
- NVIDIA: it guarantees part of the value of the first nine PORTS-Pike buildings if the tenant becomes insolvent or misses payments, up to $105 billion and declining over time; OpenAI, not SB Energy, pays NVIDIA for it.
- Parent support: SB Energy owes its parent $709.5 million of notes, to be repaid at the IPO, and the parent Energy Global guarantees completion to Cosmos noteholders and to the Milam and PORTS-Pike tenants.
20 · Legal cases · as of Sep 21, 2026
What legal cases does the SB Energy offer document list?
Cases are listed as the offer document describes them. A pending case is an allegation until a court or regulator decides it.
21 · What could go wrong
What could go wrong for SB Energy?
- Concentration
Data center income depends on two related tenants
All 8.8 GW-IT of signed data center capacity is leased to SoftBank and OpenAI affiliates, and the S-1/A says the company is "substantially dependent on OpenAI as a tenant and strategic partner".
Watch Any lease signed with a tenant outside SoftBank and OpenAI.
- Execution
PORTS-Pike needs power the company won't own
The 8.0 GW-IT Ohio campus, a substantial majority of the data center backlog, needs about 9.2 GW of gas generation to be built by a SoftBank affiliate, funded under the US-Japan partnership. The company has no agreement with any government entity on that funding.
Watch Funding and utility approvals for the PORTS-Pike gas generation and grid upgrades.
- Debt
Very large capital needs and debt
The company estimates about $178 billion of capital spending to build its contracted projects, about $48 billion of it within 24 months of Jun 30, 2026. Debt principal was $4,025.6 million plus $709.5 million owed to the parent at that date.
Watch Closing of construction financing for Milam and PORTS-Pike, and refinancing of debt due in early 2027.
- Execution
Penalties if data centers are late
Leases carry delay damages, some uncapped, and the company says its maximum exposure cannot be worked out. At Milam the tenant can buy out the project if the first data hall is 365 days or more late.
Watch Ready-for-service dates for Cosmos (2026-2027) and Milam (2027-2028).
- Concentration
Few power customers and swinging hedge values
The largest power customer was 29% of FY2025 revenue. Unrealized hedge gains, which change with power prices, were 29.7% of FY2025 revenue and 48.6% of revenue in the six months to Jun 30, 2026.
Watch Revenue from customer contracts, reported separately from hedge results.
- Regulation
Tighter tax-credit rules for solar
Under the law signed Jul 4, 2025, solar projects that begin construction after Jul 4, 2026 must be in service by Dec 31, 2027 to keep tax credits, and new foreign-entity rules apply from 2026. The S-1/A also says the tax-equity market has contracted.
Watch Tax-equity deals for projects under construction.
22 · Risks of the offer
What risks does the SB Energy offer document flag?
SoftBank keeps control
After the IPO SoftBank will hold most of the votes. Under a shareholders' agreement it can nominate six of nine directors while it owns 50% or more, and keeps consent rights over board size, dividends and delisting until its voting power falls below 33%.
Non-voting shares, warrants and later sales
NVIDIA's non-voting Class N shares can convert into voting stock, OpenAI warrants can vest later on project milestones or market-value levels, and SoftBank, NVIDIA and OpenAI have registration rights. The S-1/A says future sales could cause the market price to fall.
Broad discretion over the money
The company states no amounts for any use of proceeds and says it will have broad discretion in spending the money.
Weak internal controls
The material weakness in controls over complex accounting, found in the FY2024 and FY2025 statements, was not fixed at Jun 30, 2026.
No dividends
SB Energy has never paid a cash dividend and does not expect to. Its new credit facility bars cash dividends before Jan 1, 2029.
Limits on large stakes
Because it owns power plants, a buyer generally cannot acquire 10% or more of its voting shares without approval from the Federal Energy Regulatory Commission (FERC).
23 · How it got here
How did SB Energy get here?
2019
Milestone
Power business starts
The solar and storage business began in 2019, the S-1/A says.
2025
Milestone
Buys a data center builder
Acquired Studio 151, a data center construction and operations firm.
2025
Business-model change
First data center lease
In Nov 2025 a SoftBank affiliate signed a 15-year lease for the Cosmos campus in Travis County, Texas.
2026
Business-model change
OpenAI leases and warrants
In Jan 2026 OpenAI affiliates leased two Milam County buildings (753 MW-IT), and SB Energy issued warrants to OpenAI.
2026
Milestone
PORTS-Pike leases and NVIDIA deal
On Aug 17, 2026 an OpenAI affiliate leased 17 planned buildings in Pike County, Ohio, and NVIDIA prepaid $1.5 billion for future Class N shares.
2026
Milestone
Becomes SB Energy, Inc.
Converted from a Delaware to a Texas corporation on Aug 28, 2026, and renamed from SE Global Holdings, Inc. on Aug 31, 2026.
2026
Milestone
IPO filings
A confidential draft was submitted on May 22, 2026. The public S-1 followed on Sep 1, 2026 (announced the next day) and Amendment No. 2 on Sep 21, 2026.
Source: SB Energy, Inc. Form S-1/A (Amendment No. 2) registration statement with preliminary prospectus, filed Sep 21, 2026 (Registration No. 333-298675); EDGAR filing list for SB Energy, Inc. (CIK 0002133037), checked Oct 27, 2026: S-1/A No. 2 (Sep 21, 2026) is the latest filing; no later S-1/A, FWP or 424B4; SB Energy Announces Public Filing of Registration Statement for Proposed Initial Public Offering (Sep 2, 2026)
24 · Both sides
What do supporters and critics point to?
What supporters point to
- Signed data center leases run about 15 to 20 years with no termination for convenience; the company reports weighted average remaining contract lengths of 19.6 years for data centers and 16.6 years for power.
- The company says it has developed, financed and begun construction on 4.7 GWac of solar and storage since 2019, across 37 project financings.
- Revenue from customer contracts rose 42.2% to $143.0 million in FY2025, and power generated rose 15.5% to 5,097 GWh.
- NVIDIA has agreed to invest $3.0 billion and guarantees part of the value of the first nine PORTS-Pike buildings if the tenant defaults, according to the S-1/A.
- Industry data from Altman Solon, as cited in the S-1/A, puts global data center capacity at about 82 GW at the end of 2025 and projects demand of 274 GW by 2030.
What critics point to
- Every signed data center lease is with a SoftBank or OpenAI affiliate; the S-1/A reports no unaffiliated data center tenant.
- No data center is operating, and 8.0 GW-IT of the 8.8 GW-IT contracted is at PORTS-Pike, which is not yet under construction and relies on gas generation SB Energy will not own.
- Losses were $738.0 million in FY2025 and $3,208.9 million in the first half of 2026 (mostly non-cash), and the accumulated deficit reached $3,803.0 million at Jun 30, 2026.
- Unrealized hedge gains were 48.6% of revenue in the first half of 2026, when revenue from customer contracts fell 5.0%.
- SoftBank keeps control and the company plans to use controlled-company exemptions from board independence rules; it also reports a material weakness in internal controls.
25 · What to watch next
What should you watch next for SB Energy?
Next event
Amended S-1 with a price range and share count
Date not announced yet.
Price range and share count
Still blank in the S-1/A: shares offered, price range, NVIDIA's Class N share count and SoftBank's stake after the IPO.
One-off stock-based pay at the IPO
The S-1/A says some incentive awards vest early at the IPO and the treatment of management profits units is still being finalized; the extra expense is blank.
First data center rent
Cosmos rent is due from the earlier of Dec 11, 2026 or the ready-for-service date.
Financing for Milam and PORTS-Pike
Construction financing for both campuses was in active discussions and not closed at the S-1/A date.
Debt due in early 2027
Athos Storage ($361.9 million, by Feb 26, 2027) and Pelicans Jaw ($857.8 million, by Mar 31, 2027) loans fall due.
Material weakness
Whether later filings report the control weakness as fixed.
26 · Key facts
Key facts about SB Energy
- What does SB Energy do?
- SB Energy, Inc. builds and runs solar farms and battery storage plants in the US and is building AI data center campuses to lease to tenants, according to its S-1/A filed Sep 21, 2026. No SB Energy data center was operating at that date.
- How does SB Energy make money?
- SB Energy earns almost all its revenue by selling electricity and renewable energy certificates under long-term contracts, plus results on power price hedges. In FY2025, $143.0 million of its $213.5 million revenue came from customer contracts and $63.3 million was unrealized hedge gains.
- Who are SB Energy's customers?
- SB Energy sells power to utilities, municipal bodies, power authorities, energy service companies, community choice aggregators and large companies; its largest customer was 29% of FY2025 revenue. All its signed data center leases, as of Sep 21, 2026, are with SoftBank and OpenAI affiliates.
- How big is SB Energy?
- In FY2025 (the year to Dec 31, 2025), SB Energy reported revenue of $213.5 million and a net loss attributable to the company of $738.0 million, including $674.1 million of non-cash stock-based pay. Its total assets were $13,522.2 million at Jun 30, 2026.
- Why did SB Energy report a loss of over $3 billion in the first half of 2026?
- SB Energy's net loss attributable to the company was $3,208.9 million in the six months to Jun 30, 2026. It included a $2,573.1 million non-cash loss on warrants issued to OpenAI and $589.5 million of non-cash stock-based pay; cash used in operations was $55.6 million.
- Who owns SB Energy before the IPO?
- Before the IPO, SB Energy's only stockholder of record is its parent SBE Global, LP, part of an ownership chain controlled by SoftBank Group Corp., per the S-1/A dated Sep 21, 2026. SoftBank will keep enough votes after the IPO for SB Energy to be a "controlled company" under Nasdaq rules.
- What is the SB Energy IPO?
- SB Energy plans to sell new common stock on Nasdaq and Nasdaq Texas under the symbol SBE; its S-1/A of Sep 21, 2026 does not yet state the price range or number of shares. No existing stockholder is selling. NVIDIA has separately agreed to invest $3.0 billion in non-voting Class N shares.
- What will SB Energy do with the IPO money?
- SB Energy says in its S-1/A of Sep 21, 2026 that it expects to use substantially all the net proceeds for general corporate purposes, mainly building its data center and power projects. It states no amounts.
27 · Sources and changes
Where every number on this page comes from
Sources (3 documents)
- S1SB Energy, Inc. Form S-1/A (Amendment No. 2) registration statement with preliminary prospectus, filed Sep 21, 2026 (Registration No. 333-298675) · SEC EDGAR (filed by SB Energy, Inc., CIK 0002133037) · Tier 1: company or exchange filing · Sep 21, 2026
- S7EDGAR filing list for SB Energy, Inc. (CIK 0002133037), checked Oct 27, 2026: S-1/A No. 2 (Sep 21, 2026) is the latest filing; no later S-1/A, FWP or 424B4 · SEC EDGAR · Tier 1: company or exchange filing · Oct 27, 2026
- S8SB Energy Announces Public Filing of Registration Statement for Proposed Initial Public Offering (Sep 2, 2026) · SoftBank Group Corp. (newsroom) · Tier 3: context only · Sep 2, 2026
Changes to this page (v1 · Oct 27, 2026)
- v1 · Oct 27, 2026First version, based on Amendment No. 2 to the S-1 filed Sep 21, 2026. (first version, based on the S-1/A)
Numbers come only from tier 1 and tier 2 sources. Read how we research.
Disclaimer
For learning only. Cityfort is not a registered investment adviser or broker-dealer and does not recommend buying or selling any security. Prices shown are dated and may be out of date.
Investing in securities involves risk, including loss of capital. Before making any investment decision, do your own research and consider consulting a registered investment adviser or other qualified professional.
Cityfort, its owners and contributors may or may not hold securities of companies covered. Cityfort is not paid by any company it covers. Content is not an offer or solicitation to buy or sell any security, including in any initial public offering.
Read the full disclaimerHide the full disclaimer
Cityfort publishes general educational content that explains how listed companies work. Cityfort is not registered with the US Securities and Exchange Commission or any state securities regulator as an investment adviser, and is not a broker-dealer or a member of FINRA. Cityfort does not provide investment, tax or legal advice, recommendations, ratings, price targets or any opinion on whether to buy, sell or hold any security. Nothing on the site is tailored to any person's circumstances.
All information is taken from publicly available sources, mainly company filings with the SEC, which are listed on each page with dates. We work to keep it accurate and correct errors publicly, but we do not guarantee that it is complete, accurate or up to date. Any market price or price-based ratio shown is dated, may be out of date by the time you read it, and is included only to explain concepts.
Statements by company management, including forward-looking statements and guidance, are reported as the company's statements, with their date and source; they are not our forecasts. Adjusted (non-GAAP) figures are the company's own measures and are shown next to the official (GAAP) figures.